| Roberts & Schaefer Company (R&S) designed and installed
the first rail car flood loading system in the Powder River Basin
of Wyoming over 30 years ago. Since then, batch-weigh technology
has refined the systems, optimised weight accuracy, and maximised
the speed of loading.
We have been a part of these advancements, applying this new
and continually improving technology to a broad range of facilities
operating at loading rates exceeding 9,000 tph. As demurrage times
decreased, rotary rail and other rapid-discharge car dump systems
become mandatory, as well as sophisticated truck loading and unloading.
Barge loading and unloading systems further expand the ability
to address the varying requirements.
The facilities below show our "Full Service" capabilities
and help to define our credentials and breadth of experience.
KENNECOTT ENERGY
Jacobs Ranch Mine Construction
Gillette, Wyoming
R&S provided complete project management, procurement, and
construction services under a turnkey contract to build the coal
handling, crushing, storage and load out facilitates at the Jacobs
Ranch. The plant has been designed for a production rate of 16
million tpy. In-depth project information
TENNESSEE VALLEY AUTHORITY
Fossil
Plant
Gallatin Tennessee
TVA awarded a turnkey contract to Roberts & Schaefer for
a 1,400 tph barge unloading facility with material handling and
marine facilities to dock and unload barges. Tugboat moorings,
clamshell barge unloader, double-roll crusher and a sampling-service
building were also included. In-depth
project information
|