| The initial phase in the design, construction and commissioning
of the grinding, milling, and pyro-processing areas of a cement
facility begins with the manufacturers of the major process equipment.
The grinding, calcining, pre-heaters, kiln and cooler system equipment,
are customarily selected by the owner working directly with the
manufacturers.
The equipment selected defines the general configuration of the
facility, the initial arrangement of the ancillary support systems,
and the material handling, storage and load out systems. Successful
projects are accomplished through the close working relationship
between the owner and the engineer.
Roberts & Schaefer Company's (R&S) cement processing
personnel and our century long history of professional services
and construction management offer a valuable resource to the cement
industry. We accept complete responsibility for the engineering,
construction and commissioning of such facilities. Our experience
and understanding provides the assurance of quality performance,
executed with care and diligence.
Two projects that illustrate our experience are highlighted below.
ASH GROVE CEMENT COMPANY
Kiln
ID Fan Replacement
Leamington, Utah
After kiln ID fan failures recurred frequently for many years,
Ash Grove Cement Company called on R&S to find a solution
that would eliminate the significant down (INSERT SPACE) time
and lost productivity from its plant outages. In-depth
project information
ASH GROVE CEMENT COMPANY
Clinker
Cooler Optimisation Study
Leamington, Utah
PacifiCorp had R&S suggest optimisations to Ash Grove Cement
Company's clinker cooler system. Outlet dampers controlled the
fans and suggested improvements that included variable-speed drive
fans and control system modifications. In-depth
project information
|