ROBERTS AND SCHAEFER LOGO
WHO WE ARE
INDUSTRIES SERVED
SERVICES PROVIDED
LITERATURE REQUEST
PROJECT LISTS
by Industry Served
by Service Provided
FTP
PARENT COMPANY
CONTACT US
   
ROBERTS AND SCHAEFER COMPANY - How the world processes its resources
SEARCH


ELECTRIC UTILITY
Bituminous GOB Handling

Roberts & Schaefer Company (R&S) understands bituminous GOB is an inconsistent fossil fuel exhibiting a wide range of material handling and storage characteristics as its moisture and size change. The design principles of handling GOB are to accommodate these flow variations that occur. Such design principles include transporting GOB in a manner that minimises dust generation, prevents build-up and dead storage areas in chute work and storage facilities. Bituminous GOB is the rejects material created in a coal benefication facility. R&S has designed and built over 500 coal benefication plants and related facilities.

Our bituminous GOB handling experience is illustrated by the succeeding projects in which the fuel contained enough BTU's to warrant building a power plant.

MORGANTOWN ENERGY PROJECT
Click for more project informationBechtel Power Corporation
Morgantown, West Virginia

For their Morgantown Energy Project, Bechtel chose R&S to provide engineering and procurement for processing of bituminous coal and GOB. R&S engineered the associated silos, electrical, control, instrumentation, and interfaced with supplied control systems. In-depth project information

GRANT TOWN PROJECT
Click for more project informationBibb and Associates
Grant Town, West Virginia
R&S created a GOB/Limestone preparation and handling system with vibratory feeders moving 12" x 0" GOB via conveyor to where it is wet screened, crushed and dewatered to 1/4" x 0". Limestone is crushed, dried, pneumatically transported, and then combined with processed GOB as a usable fuel. In-depth project information


© Copyright 2006 Roberts & Schaefer Company. All rights reserved.
Suggestions and feedback are welcome at webmaster@r-s.com.au.