| The grinding and preparation of limestone are specifically
designed to reduce both fuels and sorbents in fluid bed boiler
applications and are designed, constructed and commissioned by
Roberts & Schaefer Company (R&S). Most limestone grinding
systems include receipt, handling, milling, drying, and sizing
with the finished product conveyed to a storage system, and subsequently,
fed to the station's circulating fluidised bed boiler (CFB). Grinding
limestone requires a careful understanding on the handling of
fine particle sized material.
R&S' "Full Service" experience provides the added
advantage of a single supplier, accepting total responsibility
for the execution of each limestone grinding and preparation system
undertaken.
The projects below define our "Full Service" Limestone
Grinding and Preparation capabilities.
FOSTER WHEELER USA
First
Energy, Bay Shore Station
Oregon, Ohio
Under a turnkey contract, R&S designed, furnished, installed
and commissioned a limestone handling system at Bay Shore Unit
1 power station which included receiving conveyor, pocket conveyor,
air heater combustion chamber, a rod mill and dust collection
systems. In-depth project information
SCRUBGRASS POWER GENERATING COMPANY
Scrubgrass
Power Plant
Ventigo County, Pennsylvania
Scrubgrass Power Generating Co. selected R&S to create a limestone
storage and reclaim and processing facility requiring major off-site
pre-assembly and fabrication to meet the challenge of limited
on-site work. R&S met the challenge and the project was completed
in less than 15 months. In-depth