R&S was awarded a contract from Lehigh Portland Cement
selected Roberts & Schaefer to engineer, supply, build
and commission a limestone, sand, coal, coke, iron and clinker
handling facility near Union Bridge, Maryland.
The project consisted of a 2500 tph limestone dome storage
system and a 1200 tph reclaim system. The limestone is reclaimed
from the dome storage by a circular stacker / reclaimer
and conveyed to a limestone bin. The limestone is then transported
by a bucket elevator to a limestone mill for further processing.
The sand, iron, coal and coke are delivered by truck and
separately stockpiled by a longitudinal stacker. The material
is reclaimed by a scraper / reclaimer to a 400 tph conveyor
system which transports the material to individual bins.
|



|