Mineral Ridge Project

Cornucopia Resources Limited
(Mineral Ridge Resources, Inc.)
Silver Peak, Nevada


Under a turnkey contract, Roberts & Schaefer provided all process design, detailed engineering design, procurement, construction, commissioning, and start-up of the Mineral Ridge Heap Leach and Carbon Absorption Plant near Silver Peak.

A four-stage crushing circuit using banana screens crushes ROM ore at a rate of 950,000 tpy, producing a consistently sized 6-mesh ore. Conveyors deliver crushed ore to a heap that is arranged in 80,000-ton cells. The ore is agglomerated before being placed on the heap. After leaching, pregnant solution is processed at a rate of 600 GPM, using carbon adsorption and electrowinning to produce gold doré.

As part of the project, R&S furnished all associated utilities and other facilities, including fuel, chemical, water storage, and distribution systems, as well as the plant's truck shop, warehouse, site office, and laboratory.